2005-Now
|
NO |
PROJECT NAME |
SCOPE |
CLIENT |
YEAR |
|
1 |
CONSTRUCTION SUPERVISION OF PERIODIC MAINTENANCE WITH PERFORMANCE GUARANTEE ON JAKARTA – TANGERANG TOLL ROAD AND ULUJAMI – PONDOK AREN TOLL ROAD |
Supervision |
Indonesia Highway Corporation
|
2009 |
|
2 |
PRE DESIGN OF BAKAUHENI – TERBANGGI BESAR TOLL ROAD SECTION 1 (BAKAUHENI – BABATAN) AND SECTION 3 (TEGINENENG – TERBANGGI BESAR) |
Study, Planning, Design |
Directorate General of Highway Lampung Province |
2009 |
|
3 |
CONSTRUCTION SUPERVISION OF PERIODIC MAINTENANCE WITH PERFORMANCE GUARANTEE ON PADALEUNYI TOLL ROAD YEAR 2009 |
Supervision |
Indonesia Highway Corporation |
2009 |
|
4 |
CONSTRUCTION SUPERVISION OF PERIODIC MAINTENANCE WITH PERFORMANCE GUARANTEE ON PALIMANAN – KANCI TOLL ROAD YEAR 2009 |
Supervision |
Indonesia Highway Corporation |
2009 |
|
5 |
REVIEW OF DETAILED ENGINEERING DESIGN (DED) FOR RELOCATION OF SURABAYA – GEMPOL TOLL ROAD (SECTION PORONG – GEMPOL) |
Design |
Indonesia Highway Corporation |
2009 |
|
6 |
CONSTRUCTION SUPERVISION OF TOLL ROAD WIDENING FROM 2 TO 3 LANES ON KM.05+185 – KM.05+500 A/B OF PONDOK RANJI – ULUJAMI TOLL ROAD PROJECT |
Supervision |
Indonesia Highway Corporation |
2009 |
|
7 |
DETAIL ENGINEERING DESIGN (DED) OF ACCESS ROAD, UNDER PASS AND CLOVER BALOHAN – TELUK SABANG, NAD PROVINCE |
Design |
(Satker PKBS) Sabang, NAD Province |
2009 |
|
8 |
CONSTRUCTION SUPERVISION SERVICES OF ROAD AND BRIDGE WEST LINE, NAD PROVINCE, PACKAGE : 06/2009 |
Supervision |
(SNVT Perencanaan dan Pengawasan Jalan dan Jembatan) NAD Province |
2009 |
|
9 |
COMPILATION OF MASTER PLAN CONCEPT FOR RESEARCH AND DEVELOPMENT OF INDONESIA CONSTRUCTION |
Study, Planning, Survey & Investigation |
BPSDM/Department of Public Works |
2009 |
|
10 |
CONSULTING SERVICES FOR THE FINAL ENGINEERING DESIGN (FED) TOLL ROAD CIAWI – SUKABUMI, SECTION 3 AND 4 : CIBADAK – SUKABUMI STA.26+250 – STA.53+600 (27,35 KM) |
Design |
PT Semesta Marga Raya |
2008 |
|
11 |
CONSULTING SERVICES FOR THE FINAL ENGINEERING DESIGN OF ROAD BULU SEUMA – KUALA BARO – SINGKIL (CONTINUATION) NAD PROVINCE (PACKAGE : PR-12) |
Design |
Directorate General of Highway and Human Settlement NAD Province |
2008 |
|
12 |
CONSTRUCTION SUPERVISION SERVICES FOR CONSTRUCTION OF KANCI – PEJAGAN TOLL ROAD STA. 233+000 – STA. 268+000 |
Supervision |
PT Semesta Marga Raya |
2008 |
|
13 |
CONSTRUCTION SUPERVISION SERVICES FOR ADDITIONAL OF NORTH COLUMN SIDE OF TOLL PROF.DR.IR SEDYATMO TOLL ROAD PACKAGE 4: LINK : PENJARINGAN – KAPUK LANE B (STA. 7+456 – STA. 11+337) |
Supervision |
Indonesia Highway Corporation |
2008 |
|
14 |
MAPPING OF LAND AVAILABILITY FOR TRANS JAVA TOLL ROAD PROJECT |
Study, Survey & Investigation |
Ministry of Public Works |
2008 |
|
15 |
CONSTRUCTION SUPERVISION FOR JAKARTA-CIKAMPEK TOLL ROAD PERIODIC REHABILITATION AND OVERLAY PROJECT |
Supervision |
Indonesia Highway Corporation |
2008 |
|
16 |
CONSTRUCTION SUPERVISION FOR JAKARTA-TANGERANG TOLL ROAD PERIODIC REHABILITATION AND OVERLAY PROJECT |
Supervision |
Indonesia Highway Corporation |
2008 |
|
17 |
CONSTRUCTION SUPERVISION FOR PALIKANCI TOLL ROAD PERIODIC REHABILITATION AND OVERLAY PROJECT |
Supervision |
Indonesia Highway Corporation |
2008 |
|
18 |
CONSTRUCTION SUPERVISION OF STRUCTURES REPAIR AND REPLACEMENT AFTER FIRE INCIDENT OF IR. WIYOTO WIYONO, MSC. TOLL ROAD AT KM 24+200 A/B. |
Supervision |
PT CMNP (Cipta Marga Nusaphala Persada) Tbk. |
2008 |
|
19 |
CONSTRUCTION SUPERVISION SERVICES OF L BOGOR RING ROAD TOLL ROAD SECTION I SENTUL SELATAN – KEDUNG HALANG (STA.0+000 – STA.3+850) |
Supervision |
Indonesia Highway Corporation |
2008 |
|
20 |
CONSULTING SERVICES FOR THE ROW PLAN PREPARATION AND DETAILED ENGINEERING DESIGN OF SEMARANG – SOLO TOLL ROAD PHASE II LINK : SALATIGA-BOYOLALI (STA.40+200-STA.63+100) |
Design, Survey & Investigation |
Indonesia Highway Corporation |
2008 |
|
21 |
MAPPING FOR POTENTIAL DEVELOPING OF KASIBA/LISIBA BS IN 18 LOCATION |
Study, Planning, Survey & Investigation |
State Ministry of Public Housing |
2008 |
|
22 |
ROAD AND BRIDGE ENGINEERING DESIGN NON MAIN LINE SOUTH KALIMANTAN |
Design |
Ministry of Public Works |
2007 |
|
23 |
CONSULTING SERVICES FOR CONSTRUCTION SUPERVISION JAKARTA – CIKAMPEK TOLL ROAD PROJECT ( KM 31+400 - 34+400 ) |
Supervision |
Indonesia Highway Corporation |
2007 |
|
24 |
CONSULTING SERVICES FOR CONSTRUCTION SUPERVISION OF TECHNICAL NATIONAL ROAD PROJECT, PACKAGE BRR-PW JN 01 |
Supervision |
BRR Aceh & Nias |
2007 |
|
25 |
CONSTRUCTION SUPERVISION FOR SEMARANG TOLL ROAD PERIODIC REHABILITATION AND OVERLAY PROJECT, CENTRAL JAVA |
Supervision |
Indonesia Highway Corporation |
2007 |
|
26 |
CONSTRUCTION SUPERVISION FOR PURBALEUNYI TOLL ROAD PERIODIC REHABILITATION AND OVERLAY PROJECT, WEST JAVA |
Supervision |
Indonesia Highway Corporation |
2007 |
|
27 |
CONSULTING SERVICES FOR TOLL ROAD MAPPING PREPARATION PROJECT |
Study |
BPJT |
2007 |
|
28 |
INSTITUTIONAL GUIDANCE FOR DEVELOPMENT ACCELERATING OF APARTMENT IN URBAN REGION |
Study, Planning, Survey & Investigation |
State Ministry of Public Housing |
2007 |
|
29 |
DESIGN AND SUPERVISION OF JAKARTA OUTER RING ROAD (JORR) SECTION W-1 |
Design, Supervision |
PT Jakarta Lingkar Baratsatu |
2006 |
|
30 |
DETAILED ENGINEERING DESIGN OF DEPOK – ANTASARI TOLL ROAD |
Planning, Design |
Indonesia Highway Corporation |
2006 |
|
31 |
CONSULTING SERVICES FOR THE DETAILED ENGINEERING DESIGN AND CONSTRUCTION SUPERVISION OF THE TANJUNG PRIOK ACCESS ROAD CONSTRUCTION PROJECT, PHASE 1 |
Supervision |
Ministry of Public Works |
2006 |
|
32 |
TECHNICAL SUPERVISION WORKS FOR KABUPATEN ROADS PACKAGE PW – 03C – BRR ACEH |
Supervision |
BRR Aceh-Nias |
2006 |
|
33 |
CONSULTING SERVICES FOR REGIONAL DESIGN AND SUPERVISION CONSULTANTS (RDCSs) TEAM I SECOND EASTERN INDONESIA REGION TRANSPORT PROJECT (EIRTP-2) UNDER IBRD |
Study, Planning, Design, Supervision |
Directorate General of Highway, IBRD |
2006 |
|
34 |
TECHNICAL ASSISTANCE OF OBSERVATION MANAGEMENT AND MONITORING OF EXECUTION AGREEMENT OF TOLL ROAD ENTERPASING |
Project Management |
BPJT |
2006 |
|
35 |
MONITORING AND EVALUATION OF 2006 LEBARAN ROUTE AND COMPILATION OF STANDART FORMAT OF INFORMATION DATA, MONTHLY REPORT AND YEARLY REPORT OF ROAD EXECUTION |
Feasibility Study |
Ministry of Public Works |
2006 |
|
36 |
COMPILATION OF DESIGN STANDART OF TOLL ROAD SUBJECT |
Feasibility Study |
BPJT |
2006 |
|
37 |
COMPILATION OF TOLL ROAD TECHNICAL GUIDANCE DESIGN |
Feasibility Study |
BPJT |
2006 |
|
38 |
CONSULTING SERVICES FOR THE ROAD REHABILITATION (SECTOR) PROJECT (RRSP) UNDER ADB LOAN NO. 1798-INO (DESIGN AND FIELD TEAM) PROVINCE OF BANTEN |
Design, Supervision |
Ministry of Public Works |
2006 |
|
39 |
CONSTRUCTION MANAGEMENT FOR DEVELOPMENT OF RUSUNAWA (LOW COST APARTMENT) II LOCATION : BANDUNG |
Study, Planning, Survey & Investigation |
Directorate General of Human Settlement |
2006 |
|
40 |
INDENTIFICATION DEVELOPMENT OF HOUSING AT JABOTABEK AREA |
Study, Planning, Survey & Investigation |
State Ministry of Public Housing |
2006 |
|
41 |
COMPILATION OF REGIONAL MANAGEMENT GUIDANCE CONCEPT FOR METROPOLITAN AREA (PACKAGE 13) |
Study, Planning, Survey & Investigation |
Directorate General of Spatial Planning |
2006 |
|
42 |
TECHNICAL ASSISTANCE FOR COMPILATION OF ZONING REGULATION OF URBAN AREA PALEMBANG (PACKAGE 5) |
Study, Planning, Survey & Investigation |
Directorate General of Spatial Planning |
2006 |
|
43 |
FINAL ENGINEERING DESIGN OF BOGOR RING ROAD TOLL ROAD |
Planning, Design |
Indonesia Highway Corporation |
2005 |
|
44 |
TECHNICAL ASSISTANCE OF EVALUATION OF TOLL ROAD PROJECT CONTINUATION |
Study, Planning |
BPJT |
2005 |
|
45 |
COMPILATION WORK OF SKK, SLK AND MUK OF ROAD, BUILDING AND BRIDGE TRAINING ITEMS |
Study, Planning |
BPJT |
2005 |
|
46 |
CONSTRUCTION SUPERVISION FOR ROAD PROJECT PACKAGE 07 6,50 KM IN CENTRAL KALIMANTAN PROVINCE |
Supervision |
Directorate General of Highway |
2005 |
|
47 |
COMPILATION OF MEDIATE PERIODE OF TIME DEVELOPMENT PROGRAMME OF PULANG PISAU CITY (2006-2016 |
Study, Planning, Survey & Investigation |
Directorate General of Spatial Planning |
2005 |

